Crossrail

In recent years we have become specialist installers of temporary hoardings for Network Rail and Crossrail projects throughout London and the Home Counties.

Working to strict timelines and in hostile and safety critical environments we have developed procedures and methods of operating that lead the way in safe station and platform working.  

Our experienced and conscientious install teams are all PTS (Personal Track Safety) trained and work closely with on site management and other trades to create a cohesive and efficient working environment; essential in ensuring the successful completion of project critical work phases under possession and in engineering hours.

Working alongside draftsman and civil engineers our experienced managers provide a complete design, consultancy, fabrication and install package to help Principle Contractors achieve their objectives. 

Capable of producing detailed designs based on civil engineering calculations we are able to guarantee the safety and effectiveness of our systems. Whether it is for pedestrian or vehicular separation we are well placed to cater for all your temporary hoarding needs.

Cross Rail Logo Blue

Chris Hunford

Senior Engineer, Costain/ Laing O’Rourke
Bond Street Station Upgrade Project

 
The manufacture and installation of the site security fencing was undertaken in a professional and methodical way. The end product is excellent and Littlewood Fencing co-operated beyond their remit to help the site run in an effective and safe manner.
 

Our Crossrail Projects:

Paddington C405 Eastbourne Terrace

Bond Street Station Upgrade

London Bridge Station Upgrade

Farringdon Station Upgrade

Mile End Shaft Excavation

Plumstead + North Woolwich Tunnels

Woolwich Connaught Tunnels

Romford Station Upgrade

Ilford Station Upgrade