Our Projects

 
 

As an organisation we are involved in numerous projects throughout the UK. At any one time we may be working on over 30 separate schemes that all require high levels of planning, attention to detail and management input.

It is for this reason we directly employ a sizeable team of contracts managers, designers, HSQE advisors and support staff plus over 150 on site operatives and supervisors.

We are well placed to offer turnkey solutions to principle contractors, local authorities, government departments, private companies and blue chip organisations.

Capable of operating as a Principle Contractor ourselves we have successfully completed contracts in excess of £3 million. Below are just some of the projects we have undertaken in our different departments over the last few years, and below that, testimonials from clients.

Testament to our professional approach and customer focused service we are framework providers to a variety of organisations including:

  • Thames Water
  • Ministry of Justice
  • Anglian Water
  • Bristol Water
  • Wales and West Utilities
  • Western Power Distribution
  • Environment Agency

Other organisations we have worked for include:   

  • Centre Parks
  • Brighton + Hove Albion FC Training Ground
  • DP World/ London Gateway
  • Gatwick Airport
  • Project Fox Data Centre
 
 

Case Studies

 
 
 

Kier Construction

Project: Adur Civic Centre
Value: £41,860
Duration: 3 weeks.
Description: 309m of hoarding installed in preparation for demolition of existing building. Installed by a gang of 2 people.

Kier Hoarding
 
 
 
 

European Land

Project: St Mary's Hospital, London
Value: £55,000
Description: Louvre Fencing Italia-80, along the waterside.

St Mary's Hospital
 
 
 
 

Kiers

Project: Newhaven School
Value: £65,000
Duration: 12 Months 
Description: Supply and installation of temporary fencing for enabling works, supply and installation of mesh boundary fencing and automated entrance gate. Accoustic and sprinkler tank enclosure shown in photo installed and designed by Littlewood Fencing.

Newhaven School
 
 
 
 

Quantum Construction 

Project: Ashford Retail Park
Value: £110,000
Duration: 4 Months
Description: Supply and installation of Lang and Faulton Italia 80v louvred fencing and gates and Jackson's Barbican Railings. As well as timber knee rail and crash barrier.

Ashford Retail Park
 
 
 
 

Causeway School

Project: Causeway School 
Duration: 6 Weeks
Description: Refurbishment of existing netball court and fencing. Plus installation of 7v7 3G astro pitch and lighting.

Causeway School

Eurotunnel

Project: Eurotunnel Calais Security Fencing
Date: September 2015 - July 2016
Duration: 10 Months
Description: Littlewood Fencing Ltd was initially entrusted with installing approximately 3000m of high security fencing and associated gates, however to date we have completed in excess of 6000m of the 4m high weld mesh system. 

Due to the increased threat level and significant number of attacks on the fence 3000m has been enhanced with a second layer of weld mesh to further delay and deter the would be intruders.

MORE INFO
Calais Security Fence
 
 
 

AMHU Llandough

Project: Hafan Y Coed MHU - University Hospital Llandough
Date: October 2015 - April 2016
Value: £300,000
Duration: 6 Months
Description: A joint venture between Littlewood Fencing and CLD Fencing Systems has enabled a secure and safe environment to be established for Mental Health patients at the new Hafan Y Coed (Haven of Trees) Mental Health Unit. 

674m of security mesh fencing was installed around the perimeter and with 18 gates in total on the site; all the access control systems needed to be designed to offer Anti-Climb, Anti-Ligature and Anti-Cut including fully concealed hinges and locks. With this job we have managed to create a safe, sound and secure environment for all patients at the facility.

MORE INFO
MHU Photo
 
 
 
 

Beard Construction

Project: Millview NHS Hospital
Date: April 2016 - June 2016
Value: £130,000
Duration: 3 Months
Description: 5.2mhigh 358 mesh security fencing with steel sheeting and printed graphics across the facia. All associated ground works were delivered by Littlewood as well, including; new concrete paths and turfing.

Millview NHS
 
 
 
 

NHS Trusts

Project: Various- Ashen Hill / Centurion House, Maidstone Hospital / Southview.
Date: Feb 2010-12
Value: £1.25 million +
Duration: Various
Description: Various systems including perimeter security (pictured), acoustic, site boundary & demarcation and access gates etc.

NHS Trust - Ashen Hill
 
 
 
 

Morgan Sindall / Cross Rail

Project: Barbers Rd, Puddingmill Lane, London.
Date: 2016 - present
Value: £50,000
Description: Still in progress Exmesh 3m high SR3 Fencing. 

Cross Rail Exmesh
 

Crossrail

Client: Network Rail + Crossrail
Project: Various Station developments across London- Temporary Site Hoardings
Date: 2012- present
Value: £2 million +
Duration: Various including possession work and engineering hours
Description: Temporary Hoarding, Isoclad, VCB and elite concrete blocks

MORE INFO
Crossrail
 
 
 

Cambridge Train Station

Client: Volker Fitzpatrick
Project: Chesterton Sidings & Cambridge Train Station
Date: 2015 - Present
Value: £500,000
Duration: 18 months (ongoing) 
Description: We have currently been on site for circa 18 months already completing 2km of palisade fencing, post & wire fencing and various gates. We have just secured nearly £200k in additional works including this live Willow acoustic eco noise barrier, we are also installing all of the platform fencing and gates on the 4 new platforms of the new station. The project also includes high security weldmesh fencing and gates.

Cambridge Station
 
 
 
 

Morgan Sindall / Crossrail

Client: Morgan Sindall for Crossrail
Project: Puddingmill Lane, Urban Realm and Greenway Fencing (Stratford)
Date: September 2016 - Present
Value: £300,000
Duration: 18 months (Including 12 month design consultation)
Description:  Various types of boundary and high security fencing (SR3 Rated) including; steel and PPC railings, palisade, safety barrier, bespoke overhead portals (height restriction portals), general timber fencing, bespoke palisade and railing gates.

Puddingmill Lane

Network Rail

Project: Network Rail Training Campus - Basingstoke
Date: June 2016
Value: £127,300
Duration: 6 Weeks
Description: This is a high security site where security, speed of operation and reliability are paramount. The entire job was carried out by Littlewood Automation's in house engineers, from planning though the ground works and installation to the final commissioning of each element.

  • 2x PAS 68 K8 Crash Tested Rising Kerb
  • 2x Bi-Folding Trackless Speed Gates
  • 1x Automated Turnstile
  • 1x Semi-Automated Pedestrian Gate 
  • 1x 7.5m Wide x 3.0m High Automatic Cantilever Sliding Gate
  • 9x PAS 68 40 mph Static Articulated Crash Tested Bollards
 
Basingstoke Complete
 
 
 
 

Kier Construction

Project: Acorn Retail Park 
Date: June 2016
Value: £46,850
Duration: 1 Week
Description: 17m telescopic sliding cantilever gate, to secure and allow access to a large retail park. One of the largest automated gated installed by Littlewood Automation.

Acorn Retail Gate
 

Chediston Solar Farm

Project: 12.3 mW Site - Ipswitch, Suffolk
Duration: 12 Weeks
Description: On this site there were over 300 deliveries which included 550 tons of framework and 50,400 panels! The site was built in 12 weeks in horrendous weather conditions. At peak we had 93 team members on site building 3.85MW in one week and installing 5,350 panels in just one day.

Chediston Solar
 
 
 
 

Baglan Bay Solar Farm

Project: 5 mW Site - Port Talbot, Wales
Description: This was the first brown field site we installed on - an old oil refinery in close proximity to the testing site of Mulberry Harbours, complete with an above ground gas installation. The ground was full of styrenes and other contaminants. Due to the previous developments on this site the ground proved very challenging. These issues were overcome by using a combination of piling, concrete cast on site and resin bolt down on existing foundations.

Baglan Bay
 
 
 
 

ABP Project

Project: 5 mW Site - Barry, Wales
Description: This twin post screw pile system proved to be another challenging brownfield installation due to the varying depths of buried demolition construction materials.

ABP Project
 
 
 
 

United Utilities Solar Farm

Project: 2.2 mW Site - Rochdale, Manchester
Description: Very poor & contaminated ground conditions made this a very demanding site needing constant review throughout the construction. One area required additional Platypus supports to be installed post build in order to maintain system integrity.

United Utilities Farm
 
 

Testimonials

 
 

See what our clients have to say about Littlewood Fencing. We aim to complete every single job on time, on budget and with health and safety at the forefront of everything we do. Because of this we have built a reputation for high quality, efficient and most of all safe working at all times.

Littlewood Team
 
 
 
 
©2017 Littlewood Fencing Ltd | Sitemap | Cookies | InFX Professional Commerce
Registered office: Littlewood Fencing Ltd North Trade Road Battle East Sussex TN 33 9LJ. Registered in England & Wales,
Company no: 4204136. VAT number 6831878